Project Description

The buildings previous plumbers Denzo taped up a 3m section of 150mm copper which was completely split open. There was raw sewage pouring out into the chamber room.

 

We organised a building shut down and blocked off all the sewer lines to the main outlet line. We then cut out the damaged pipework and installed a new pvc line. We also installed a reflux valve to prevent any blow backs from the main line entering the building.