Project Description

Last year the heating and cooling system was being upgraded. There was a leak one afternoon which flooded out the boiler room and leaked downstairs into the carpark which has all the clients cars parked.

 

We came up with suitable design to install a channel drain right around the main concrete plinth which has all the pumps and chillers on. We also installed 3 new floor drains to keep the water away from the main electrical circuit board. Once the whole room is water proofed it will be safe guarded in the event of another leak in the plant room.